GreenStar

Greenstar Stock Quote

by Yahoo Finance
 GSAE.PK
Time 1:42pm ET
Trade 1.00
Change -0.07
% Chg -6.54%
Volume 16,799
Intraday 

NOTOS project

Belo Blato

Belo Blato

Map Networking - Serbia

  • Electricity Grid Map
  • Wind Speed Map
  • Natural Resorts

Show it!

Alternative energy

news

Wind as renewable energy

news

Try it out

news
Latest news
Notos Erects Wind Sensor at Belo Blato Print E-mail
Monday, 15 June 2009
Notos is pleased to announce the installation of the wind measurement tower at the 20 MW Belo Blato site. The NRG System wind sensor is standing at the coordinates of 45 degrees 13’ 7.01” N latitude and 20 degrees 21’ 21.01” E longitude.
Last Updated ( Friday, 26 June 2009 )
Read more...
 
Friends of Sustainable Serbia conference Print E-mail
Thursday, 04 June 2009

Serbian Deputy Prime Minister for EU integration Bozidar Djelic today opened the Friends of Sustainable Serbia conference, at which more than 100 projects related to sustainable development, environmental protection, social policy and the development of the economy and know-how will be presented.

Friends of Sustainable Serbia conference
left, Mr.Miodrag Andric director Notos d.o.o/Green Star Alternative Energy Inc. ,
center Mr. Bozidar Djelic Deputy Prime Minister for European Integration
and Minister of Science and Technological Development Government of Republic of Serbia,
right, Mr. Antonije Pusic, Artist and Environmental Spokesman
Last Updated ( Friday, 05 June 2009 )
Read more...
 
Installation of the NRG 60m XHD Symphonie System Print E-mail
Tuesday, 02 June 2009

Notos has signed contract with Wellbury Wind Energy for an installation of 60m anemometer mast and the due date is 13th of June 2009.

Wind data collected from the anemometer mast during the site development phase will be compared with simultaneous data from the nearby Metering Office station at Zrenjanin.

The resulting correlations then will be used in combination with long term wind data from Zrenjanin to provide a view of the Belo Blato wind resource.

In turn this wind resource, taken with the turbine manufacturer’s power curves and our understanding of turbine wake effects and other losses, will be used later on to predict generation levels averaged over the life of the wind farm.

The NRG 60m XHD Symphonie System will be in place for 12 months period of time, afterwards it will be taken down and completely removed from the site.

Last Updated ( Friday, 26 June 2009 )
Read more...
 
Conference FRIENDS OF SUSTAINABLE SERBIA Print E-mail
Monday, 01 June 2009

Notos is invited by the Deputy Prime Minister of Serbia Mr. Djelic to join the first conference on Sustainable Energy in Serbia.

Last Updated ( Monday, 01 June 2009 )
 
<< Start < Prev 1 2 Next > End >>

Results 1 - 4 of 7

Choose language

Српски
English
Deutsch

Events

Sponsorship for the Serbian Sailing National Team

NOTOS has signed sponsorship agreement with the Serbian Sailing Nation Team on 21st of May 2009.

As sailing is tightly connected with utilizing the power of the wind, NOTOS decided to support the Serbian Sailing NT and to provide rewards for best in this clean sport.

NOTOS will be a general sponsor of the Serbian NT for a following European Optimist Championship to be held in Slovenia from 4th to 12th July 2009.

Read more...
 

RSS

Stay in touch with Notos RSS feed

Notos brochure

Brochure